2020 Refurbishment
Before
After
Side patio refurbishment
Start of shed refurbishment
Old roof in need of replacement
New roof and flashing in place
Shed front removed showing origonal lockers
Concrete pour to level the floor
Front re-frame in progress
Front aspect getting close
Carpark end complete
Front all done
Sign and winch during vandalizing effort
Damaged and vandalized sign repairs
Old winch removal preperations
Old winch ready for removal
New fender preperation
Installation of jetty fenders
Jetty fenders installed
Tyre fenders repairs
2017 - 2018
Work carried out pre-refurbishment from mid 2017 until mid 2018 to maintain the slips and general area
Before
After
Dye used for current /rip tests; following a sad loss of life due to strong and unpredictable rips in the bay.
Red Dye
Green Dye
Old and new money box, the old box finally succumbed to corrosion and break-ins.
The old box was rusted out and had been broken into twice.
The new box now has an envelope and slip system for proof of slip fee payment
Edge barriers installed due to a couple of unsuccessful drive over's!
New H5 timbers and S/S fixings used for the new barriers.
New barriers installed on silicone base, S/S fixed into concrete with kem-set, lock nuts and 2 pack painted.
Small drop-off ramp installed
New small concrete and steel reinforced ramp formed to reduce trailer drop off and improve manovering for car and trailers.
All complete in the usual professional club manor!
New sign for front of shed
Old Sign
New Sign
Shed cleared out and rodent control
Still plenty to do to maintain and improve the shed, the club helps with the Sumner wide effort to reduce rodents.
Trailer load of rubbish removed
Shed after clearing
Shed general paint
Shed Before
Shed After
New E Can safety signage
Old sign and steel frame
New sign and s/s frame
Jetty crack repairs
Just one of many jetty cracks
Repairs underway
Boat Park Marking
Line marking underway
New trailer parking marked up